Chapter 2: VessRAID Installation
35
Connecting the Power
Plug-in the power cords and turn on the switches on both power supplies.
When the power is switched on, the LEDs and LCD screen light up.
Front Panel LEDs
When boot-up is finished and the VessRAID subsystem is functioning normally:
Power, Global Enclosure Status, and Global RAID Status LEDs display
green continuously.
Controller Activity LED flashes green when there is controller activity.
System Heartbeat LED blinks green seven times in three seconds, goes
dark for six seconds, then repeats the pattern.
Figure 21.VessRAID front panel LED display
Controller LEDs
When boot-up is finished and the VessRAID subsystem is functioning normally:
Battery, and Controller status LEDs display green continuously.
Ethernet LEDs display green or flash depending on your network
connection.
Important
If you have a SAN, DAS, or Cascade with JBOD expansion,
always power on the JBOD expansion units first.
Power
Controller Activity
Global Enclosure Status
Global RAID Status
Reserved
System Heartbeat