Promise Technology E610f Manuale Pagina 398

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 397
VTrak E-Class Product Manual
376
3. Click the Next button.
The Path Selection tab displays.
4. Take the action appropriate for your policy selection.
For Round Robin and Least Queue Depth, no action is required. Skip to
step 5.
For Failover, move the path you want to be active to the Primary Path
Selected pane.
Move all other paths to the Path Available pane.
For Round Robin with Subset, move the paths you want to be active to
the Primary Path Selected pane.
Move the paths you want as standby to the Path Available pane.
You can have all paths in the Subset.
5. Click the Next button.
The Summary tab displays the current and selected (new) policy.
6. Click the Finish button to apply your settings.
The new settings take effect immediately.
See also:
“Round Robin Count” on page 378
“Refreshing the Objects” on page 379
Path Verification
Path verification monitors any failed paths and automatically verifies them if they
become available again.
There are two Path Verification Settings:
Enable / disable
Verification period in seconds
Changing Path Verification Settings
To make path verification settings:
1. Do one of the following actions:
Click the Advanced Settings icon.
From the Operations menu, choose Advanced Settings.
The Advanced Settings dialog box appears with the MPIO Parameters tab
displayed.
2. Check the Enable Path Verification box to enable path verification.
Uncheck to disable.
Vedere la pagina 397
1 2 ... 393 394 395 396 397 398 399 400 401 402 403 ... 435 436

Commenti su questo manuale

Nessun commento